The Iron Bear mission in Canada has accomplished its pilot pellet manufacturing run, proprietor and operator Cyclone Metals( ASX:CLE) stated on Thursday (October 10).
“We have now efficiently produced Direct Discount (DR) Pellets. This can be a main milestone for the Iron Bear mission. Our DR pellets demonstrated wonderful bodily and metallisation properties,” CEO Paul Berend stated in a press launch.
The mission returned direct discount pellets grading 67.5 p.c iron, 1.6 p.c silica, 0.12 p.c magnesium oxide, 0.65 p.c calcium oxide and ultra-low deleterious components.
Cyclone added that the pellets have world-class discount and metallisation properties and that they maintain wonderful bodily properties, with chilly crushing strengths of 438 to 486 kilograms per pellet.
The corporate is now beginning small-scale industrial manufacturing, with transport of bulk focus samples to potential take-off purchasers scheduled for the second quarter of 2025.
It has already collected run of mine sediment, which is about to be processed within the Iron Bear pilot plant on the COREM analysis institute in Québec Metropolis. The metallurgical testwork was carried out by COREM and accomplished in August.
The corporate additionally intends to provide Iron Bear DR focus grading 71 p.c iron and 1.1 p.c silica, together with extra DR pellets and blast furnace (BF) acid pellets.
Previously often called the Block 103 mission, the Iron Bear mission has a mineral useful resource of 16.6 billion tonnes grading 29.3 p.c iron.
It’s positioned within the mining-friendly jurisdiction of Newfoundland and Labrador, Canada, and is close to infrastructure, lower than 25 kilometers from an open-access heavy haul railway linked to the Sept Isles and Pointe Noire iron ore export ports.
The mission can be 75 kilometres away from the Menihek hydroplant, doubtlessly giving it entry to low cost renewable power.
Main iron ore export operations at the moment function within the Labrador Trough and share the identical rail and port infrastructure with Iron Bear.
Cyclone stated it should now give attention to enhancing the chemical composition of its DR pellets. The corporate can even launch engineering research that may deal with potential dangers related to energy and rail infrastructure and discover the viability of its direct transport ore and magnetite outcrops.
Don’t overlook to observe us @INN_Australia for real-time information updates!
Securities Disclosure: I, Gabrielle de la Cruz, maintain no direct funding curiosity in any firm talked about on this article.